1. Home
  2. ISTQB
  3. ATM PDF

ISTQB ATM PDF Exam Questions:

How to Get Success in ISTQB ATM Exam:

  • Avoid deceptive ATM PDF Exam Questions.
  • Focus on ATM Questions (PDF) based on the latest exam syllabus.
  • Make notes of ISTQB ATM PDF for better learning.
  • Prepare from our latest ISTQB ATM PDF file and get success in first attempt.
ATM PDF
ISTQB ATM PDF

Prepare ISTQB ATM Exam Within Short Time

Your knowledge and abilities are validated by passing the ISTQB ATM exam. Our PDF questions and answers will help you prepare for the ATM exam in a short time because it includes questions similar to the real ISTQB exam questions. After downloading the ATM ISTQB PDF exam questions, relevant to the actual exam, you can take a print of all questions and prepare them anytime, anywhere.

Realistic Scenario Based ISTQB ATM PDF Exam Questions:

Everyone wants to become certified ISTQB Test Manager and improve his/her resume. You should practice with real ATM questions. Students can benefit from the ATM exam questions which are available in PDF format. The ATM exam questions and answers are designed to match the criteria of the actual exam. If you use scenario-based ISTQB ATM questions you will have an extra potential to clear the exam on the first attempt.

Q1.

Which of the following statements describing the consequences of specifying test conditions at a detailed level is NOT true?

K2 1 credit

Answer: A
Q2.

Assume you are the Test Manager for a new software release of an e-commerce application.

The server farm consists of six servers providing different capabilities. Each capability is provided through a set of web services.

The requirements specification document contains several SLAs

(Service Level Agreements) like the following:

SLA-001: 99.5 percent of all transactions shall have a response time less than five seconds under a load of up-to 5000 concurrent users

The main objective is to assure that all the SLAs specified in the requirements specification document will be met before system release. You decide to apply a risk-based testing strategy and an early risk analysis confirms that performance is high risk. You can count on a well-written requirements specification and on a model of the system behavior under various load levels produced by the system architect.

Which of the following test activities would you expect to be the less important ones to achieve the test objectives in this scenario?

K4 3 credits

Answer: B
Q3.

Consider an information system of a Pay-Tv company based on a SOA architecture.

The integrated system currently consists of three core systems:

- a CRM (Customer Relationship Management) system

- a BRM (Billing and Revenue Management) system

- a CAS (Conditional Access System) system all of them communicating with SOA Middleware.

You have been asked to manage the testing activities for the integration of two additional off-theshelf systems from two different vendors: a SMS (Short Message Service) server and an IVR (Interactive Voice Response) system.

Assume that there is a high likelihood that the two off-the-shelf systems will be low-quality and that you have a clear proof that the testing performed by the two vendors on their systems has been unsystematic and unprofessional. This obviously leads to higher quality risk for the overall integrated system.

You are the Test Manager of this project. Your main goal is to plan for testing activities to mitigate this risk.

Which of the following answers best describes the test activities (assuming it is possible to perform all of them) you should plan for?

K4 3 credits

Answer: D
Q4.

The following are the exit criteria described in the test plan of a software product:

EX1. The test suite for the product must ensure that at least each quality risk item is covered by at least one test case (a quality risk item can be covered by more test cases).

EX2. All test cases in the test suite must be run during the execution phase.

EX3. Defects are classified into two categories: ''C'' (critical defect) and ''NC'' (non-critical defect).

No known C defects shall exist in the product at the end of the test execution phase.

Which of the following information is useless when the specified exit criteria is evaluated? K2 1 credit

Answer: C
Q5.

Which of the following is an example of the test closure activity indicated as "lessons learned"? K2 1 credit

Answer: C

Reliable Source Of Preparation For Advanced Test Manager Exam.

We provide ISTQB Test Manager certification questions along with answers to assist students in passing the ISTQB Exam. You can enhance your ISTQB ATM preparation with the help of an online practice engine. Try out our ISTQB ATM questions because 98% of Examskit users passed the final ATM exam in one go.